R# 7 EAP expires soon Follow
i noticed that i have only 3 days left for evaluation. As the evaluation period decreased between different EAP-Builds i think that
the automatic refresh, which normally occurs for EAP builds, do not work.
Regards
Klaus
Please sign in to leave a comment.
I'm having the same problem. R# 7.0.6.61 expires in 3 days. I own R# 6 but I'm now using VS11 as my main IDE so it would be nice to get an update on the R# 7 status.
Hello
We've published a new nightly build that prolongates the evaluation period, so I recommend installing that build. Thank you!
Andrey Serebryansky
Senior Support Engineer
JetBrains, Inc
http://www.jetbrains.com
"Develop with pleasure!"
Many thanks, this fixes it for me.